[images/incl_top.asp]
 
 
Tower Photos
Page 1 | Page 2 | Page 3  

Designated location of the tower
7/20/2002

The tower is a Trylon T200. 96' tall.

Tower sections awaiting assembly
Foundation excavated
Joe

Tim & Joe
Every crew needs a lovely 9-yr old assistant

 

Micah's real job was to take photos ...and play.

Micah checks out the excavation.

 

Tim hard at work

 

(He could only handle about 5 minutes of digging)

Jason
Jason's got an assistant too
The lower section
The upper section
Shane, the electrician

 

>> Page 2 >>

 

  Home   Sign Up   About   Pricing   Coverage   Services   FAQ   Log In

Aledo BroadBand  PO Box 364  Aledo, TX   76008    817.441.8541